§ Process · How we work

Four steps.
Zero surprises.

Every project — a simple banner or a large monument sign — runs through the same four stages. Here's exactly what to expect, when to expect it, and what you'll get at each stage.

  1. IDay 1–3

    Consult

    We meet (in person, on-site, or over a quick call), walk the storefront or vehicle, study the brand and get clear on the goal. You leave with a scope, a realistic timeline and a fixed-fee quote.

    You receive

    • Site visit / measurements
    • Scope + fixed quote
    • Material recommendations
  2. IIWeek 1–2

    Design

    Concepts mocked up on a real photo of your storefront or vehicle — not a flat artboard. Two rounds of revisions included; we keep iterating until it's right.

    You receive

    • Photo-realistic mockups
    • Color + material samples
    • 2 revision rounds
  3. IIIWeek 2–4

    Fabricate

    Your project is produced to the approved specifications — CNC routed, printed, laminated, wired and quality-checked where applicable. Nothing ships until the install lead signs off.

    You receive

    • Production quality control
    • QC sign-off
    • Permit drawings (if needed)
  4. IVWeek 3–8

    Install

    Permitted, licensed and insured crews. We protect the site, install on-pattern, clean up, and walk you through care before we leave.

    You receive

    • Site protection
    • On-pattern install
    • Cleanup + walkthrough
    • Care instructions

§ Principles

How we keep it honest.

Produced & Quality Checked

Design, production, specialty fabrication, permitting, and installation are coordinated through one accountable local team.

Written scope, clear estimates

Every estimate is tied to a written scope of work. Changes to scope, materials, or site conditions are documented and priced before we proceed — no surprise invoices.

Real materials

Cast vinyl, UL / ETL listed components, aluminum returns. We don't compete on the cheapest sticker.

Built to last

Premium cast vinyl, UL / ETL listed components and proven install techniques — built to hold up to Central Illinois weather.

Most projects start with a 15-minute call.

Start the consult →